When integration makes sense
More than two machines on the same pipe
An integrated system is justified when the treatment objective needs distinct process steps. The sequence is confirmed from water quality, contaminant demand, microbial targets and downstream requirements.
Reduce an oxidation load before final disinfection
Ozone may be used for color, odor or selected oxidizable constituents, followed by a separately sized UV barrier.
Separate oxidation and microbial-control duties
Each stage has a defined objective, monitoring point and operating limit rather than one generator capacity standing in for the complete process.
Integrate with existing filtration or contact equipment
Existing tanks, pumps, filters and controls are reviewed before adding ozone injection, off-gas management or a UV reactor.
Reference treatment routes
Useful starting points—not fixed recipes
These arrangements illustrate common process logic. Final sequencing and equipment depend on the actual water and the required result.
Ozone → Contact → UV
For duties where ozone provides the oxidation step and UV provides a final microbial-control barrier after the required contact stage.
Ozone → Contact → Carbon → UV
For processes that require oxidation, downstream residual or by-product management, and final UV disinfection where appropriate.
Pretreatment → Ozone → Contact → UV
Filtration or other pretreatment may be required to manage solids, UV transmittance or ozone demand before the core treatment stages.
Side-stream Ozone + Main-Line UV
For selected recirculating-water duties where ozone contact and residual control are separated from the main UV treatment line.
Two separate design bases
Ozone and UV must be sized independently
A combined process does not create one interchangeable dose number. Each technology needs its own verified inputs and performance basis.
Oxidation demand and mass transfer
Review the target constituent, water volume or flow, ozone demand, feed gas, gas concentration, transfer method, contact time, temperature, off-gas and the required residual or endpoint.
Hydraulics, UVT and target dose
Review peak and design flow, UV transmittance, target microorganism or validation basis, lamp aging, fouling, reactor hydraulics, monitoring and redundancy.
System blocks
Configure the complete treatment train
Puritor organizes the equipment around the process duty instead of presenting supporting components as unrelated product lines.
Oxygen supply and ozone generation
Air or oxygen feed, drying where required, ozone production, cooling, gas-flow control and output verification.
Injection, mixing and contact
Venturi or alternative injection, static or mechanical mixing, contact volume, pressure conditions and gas-liquid separation.
UV reactor and controls
Closed-vessel or project-specific UV stage selected around flow, UVT, dose, lamp configuration, instrumentation and service access.
Residual, off-gas and interlocks
Dissolved ozone or ORP where appropriate, UV intensity monitoring, off-gas destruction, ventilation, alarms and coordinated shutdown logic.
Important limitations
Do not specify UV + ozone by label alone
The treatment route should remain testable and explainable. Where water chemistry or oxidation demand is uncertain, laboratory or pilot work may be more reliable than increasing nominal equipment capacity.
- Not every project needs both UV and ozone.
- UV plus ozone is not automatically an advanced oxidation process.
- Generator output does not by itself define transferred ozone dose.
- UV dose and ozone dose are not interchangeable.
- Materials, residual management and site safety remain part of the design.
Start with the water
Send the process conditions—not only a target generator size